Slide Canyon Road

Completed: July 14, 2026 Location: Slide Canyon Road

This is the was repair to relieve water from slide. The grading that was done and the culvert installed

Posted by: Thomas LeClair

Lower Cabin Certified Fire Pit

Completed: July 1, 2026 Location: Cabin 6, 7, 8

Cleaned up area and brought the fire pit into compliance.

Posted by: Jeff Collins

Jonny Brown

Completed: July 1, 2026 Location: Jonny Brown and Meadow Canyon

The finished drainage and road repairs to this intersection

Posted by: Thomas LeClair

J Station repair

Completed: June 28, 2026 Location: HQ

J station repair

Posted by: Jeff Collins

WindSock

Completed: June 13, 2026 Location: Airstrip

Windsock restored.

Posted by: Thomas LeClair

Slide Canyon Muddy Area

Completed: May 15, 2026 Location: Mid Slide Canyon

This was the area on slide with the 150 foot long mud pit we repaired earlier this year

Posted by: Thomas LeClair

Slide Canyon Culvert

Completed: February 3, 2026 Location: Slide Canyon Road

there was a growing hole in Slide Canyon road caused by the end of the culvert having shifted. The joints of the culverts were not properly seated originally, removed the grout that was used to join them previously. Chiseled that out and properly repair.

Posted by: Thomas LeClair